Ordinance of 30 March 1994 on Electric Lines and Cables

Source : Federal law
Code/RS : SR 734.31
  • Abbreviation :

    LineO

  • Provision :

    Art. 81

  • Short description :

    Obligation to share the data necessary for calculation between operators

  • Nature of the provision :

    Obligation to provide each other with data

  • Status :

    In force

  • Sector :

    Energy

Actor with an obligation to share data

Power line operators

Beneficiaries

Other operators

Linking criteria for Switzerland

Linking criteria for Switzerland

Financial aspects

Not specified

Binding and/or enforceable

Mandatory

Conditions for accessing data

Be an operator; need data to calculate distances

Exceptions and limitations

Not specified

Static data

Format

No required format

Plateform

n/a

Actor with an obligation to share data Power line operators

Beneficiaries Other operators

Linking criteria for Switzerland n/a

Financial aspects Not specified

Binding and/or enforceable Mandatory

Conditions for accessing data Be an operator; need data to calculate distances

Exceptions and limitations Not specified

Time component Static data

Format No required format

Plateform n/a

Compilation and Disclaimer

This index was prepared on behalf of the IPI by the law firm id est avocats Sàrl (for the section on Swiss law) and the law firm Pierstone (for the section on European law). 

This index does not constitute legal advice, and no guarantee is given regarding its completeness. 

Neither id est avocats Sàrl, nor Pierstone, nor the IPI or the FDJP can be held liable for any decisions or actions taken on the basis of this index.